Post-InstallationMaterial Composition and Post-Installation

Its unique expression is carefully created by skilled artisans who generously apply their exceptional master craftsmanship over many processing steps.
The high quality born from the hands of artisans, without reliance on machining, is the true value of DEE MOTION and the origin of our D-NINE approach to manufacturing.

1.Interior Application Specifications 2.Exterior Application Specifications

Regarding the SDS (Safety Data Sheet)

Regarding Installation

Because this is a specialized panel material, there are several points that require attention during installation. When performing the installation, please read the installation manual carefully and proceed correctly.

Regarding Packaging

  1. 1. Packaging will typically be in a wooden crate.
  2. 2. Using a power screwdriver or similar tool, please remove all screws that have an indicator mark.
  3. 3. A protective sheet is applied to the surface, but it is thin. Please be extremely careful not to scratch the panel when removing it.
  4. 4. Please check the panel against the provided drawings and other documents.
  5. 5. An installation manual and a microfiber cloth are enclosed.
  6. 6. Please contact us if you have any questions.

Regarding Shipping

  1. 1. Normally, shipping will be via consolidated freight, with an arrival time between approximately 9:00 AM and 3:00 PM.
  2. 2. Specifying an exact delivery time is normally not possible.
  3. 3. Time-specific delivery is possible with a chartered truck. (This will incur higher fees.)
  4. 4. The arrival date may be delayed depending on the region.